టాప్ స్టోరీస్
65-foot trident inaugurated at Kailasagiri; MP outlines vision for Global Tourism Hub
09:14

The massive structure, which includes a Damarukam, was completed in approximately eight months at an estimated cost of ₹6 crore

The massive structure, which includes a Damarukam, was completed in approximately eight months at an estimated cost of ₹6 crore
{"requested_language":"te","item":{"id":"8c656d60-c022-4b4c-ad4d-619497daa6cd","slug":"65-foot-trident-inaugurated-at-kailasagiri-mp-outlines-vision-for-global-tourism-8c656d60","category":"top-stories","published_at":"2026-05-09T09:14:26Z","title":"65-foot trident inaugurated at Kailasagiri; MP outlines vision for Global Tourism Hub","summary":"The massive structure, which includes a Damarukam, was completed in approximately eight months at an estimated cost of ₹6 crore","source_url":"https://www.thehindu.com/news/cities/Visakhapatnam/65-foot-trident-inaugurated-at-kailasagiri-mp-outlines-vision-for-global-tourism-hub/article70958509.ece","source_name":"www.thehindu.com","image_url":"https://th-i.thgim.com/public/incoming/jtm0b7/article70958581.ece/alternates/LANDSCAPE_1200/65-foot-TrishulGH4FV3GCG.3.jpg.jpg","served_language":"en","is_fallback":true,"available_languages":["en"]}}